Thrust of the Budget:
(1) Safety;
(2) Consolidation;
(3) Passenger
Amenities;
(4) Fiscal
Discipline.
Some
Achievements / Initiatives:
(a) IR enters
the one billion tonne Select Club joining Chinese, Russian and US Railways;
(b) Target of 1000 crore each fixed for Rail Land
Development Authority and IR Station Development Corporation to be raised
through PPP in 2013-14
(c) Debt Service Fund, a new fund to be set up to
meet committed liabilities of debt servicing for WB and JICA loans for DFC and
other future liabilities
(d) Arunachal Pradesh brought under RAIL network
(e) 500 km new lines, 750 km doubling, 450 km gauge
conversion targeted in 2013-14
(f) 1.52 lakh vacancies being filled up this year
out of which 47,000 vacancies have been earmarked for weaker sections and
physically challenged
Safety & Modernisation:
To make
10-year corporate plan for rail safety (2014-2024)
Train Protection Warning System on Automatic
Signalling Systems to be introduced;
1. Introduction of 160/200 kmph Self Propelled
Accident Relief Trains.
Freight:
• 1,500 km to be awarded for dedicated
freight corridor FY14
• FY14
freight loading estimated 1,007 million tonne
• New
routes & Trains
Working on new railway line in Manipur
Rail Based Industries:
- A new Forged Wheel Factory to be set up at Rae Bareli in collaboration with Rashtriya Ispat Nigam Limited
- A Coach Manufacturing Unit in Sonepat District (Haryana) in collaboration with State Government;
- Setting up of six more Rail Neer bottling plants at Vijyayawada, Nagpur,Lalitpur, Bilaspur, Jaipur and Ahmedabad
Rail Tourism:
- Launching multi-modal travel package in cooperation with Jammu and Kashmir state government;
- Issuing "Yatra Parchis" to pilgrims travelling by Rail to Mata Vaishno Devi Shrine at the time of railway ticket booking Introduction of an educational tourist train with concessional fares - 'Azadi Express' - to connect places associated with freedom movemenet;
- Introduction of executive lounges at 7 more stations namely, Bilaspur, Visakhapatnam, Patna, Nagpur, Agra, Jaipur and Bengaluru
Facilities
• To put in place next generation
e-ticketing system by Dec 2013
• New
system to enable booking 7,200 tickets/min Vs 2,000 now
• SMS
alerts for reservation status being rolled out
• Plan
free Wi-Fi facility onboard trains
• To
extend internet booking timing from 00:30 IST to 23:30 IST
• Look
forward to use Aadhar services for Railways
• To
introduce 1 luxury 'Anubhuti' coach in express trains
• To
identify 60 more railway stations as model stations
• To
set up 8-10 more mechanized laundries for rail linen
• To
set up 8 women railway police units in addition to the existing 4'
No comments:
Post a Comment